398 Bond Street,
Sudbury, ON.
P3B 2K2.
FE-EZE ANYAFULU
705-988-6519
fenobus@gmail.com
EDUCATION
LONDON, UK
CITY, UNIVERSITY OF LONDON
SEP 2014 - JUL 2018
Master of Engineering (honours) in Electrical & Electronics Engineering.
SUDBURY, ON
CAMBRIAN COLLEGE
AUG 2023 - PRESENT
Ontario College Diploma in Game Design (in progress)
WORK EXPERIENCE
Software Engineer
Nytengale Technology Co. Ltd.
Feb 2022 - Present
Developed iOS, Android, and Web apps using Swift, Typescript, Python, and Firebase.
Major projects worked on:
Team Lead/Software Engineer. Velz App (July 2022–Sept. 2023):
App features: steps counting, visit history, geofencing, location recognition to identify when tourists are close
to landmarks, user authentication, and user accounts.
Client came with a design, and I organized the team to turn the design into deliverables.
In addition to the iOS app, the client needed a way to get curated data (e.g., landmark information, fun facts,
custom icons for landmarks, opening times, etc.) into our database (Firebase).
Solely responsible for developing admin dashboard apps (Retool/ Typescript) to allow clients' sta to enter
data to be uploaded to the database.
Team used agile processes: led sprint planning, standup meetings, and sprint reviews.
Bi-weekly progress report with the client (in addition to daily calls to touch base).
Released seven versions of the app (roughly every two weeks after v1.0).
Languages/ Tools used: Swift, Javascript/ Typescript, Mapbox (Swift API), Firebase (Swift and Javascript
APIs), Google Places API (Javascript API), Retool (JS/ TS), Git.
Team Lead/Software Engineer. Footballplanner.co.uk (Sep 2022–Mar 2023).
Client came with a working website that was to be upgraded.
Led a team of one designer and one programmer to design a new front end for the client and implement it.
Frontend was designed with Typescript and React.
Needed to tie in code to the client's back end (written in Python/ Django).
Languages/ Tools used: HTML/CSS, Javascript/ Typescript, React, Python.
Other tools used:
Unity/C#: Developed some levels and grayboxes for game development proposals.
React native: Used to design preliminary screens and components before the client decided on native iOS
development for Velz.
Controls Engineer/ Project Manager
3E Energy Ltd.
Apr 2019 Jan 2022
Acted as the main liaison between the customer representatives and the company CTO.
Created electrical and mechanical drawings for upgraded systems. Designed upgrade manuals for maintenance sta.
Led the troubleshooting and root Cause analyses of gas turbines and control systems.
Designed Gantt charts, project work schedules, and other technical documents needed for the project.
Prepared contract documents and evaluated tenders for gas turbine maintenance jobs.
Led a team of instrumentation technicians during outages. Ensured work was carried out on schedule.
Commissioning of re and gas systems as a lead engineer.
Project Roles and Responsibilities (2019-2022)
November 2021–January 2022. FIPL Omoku Power Station. Major Inspection and Startup of 2* GE Frame 5 Gas
Turbine Units, including Pulse Jet Commissioning, Fire & Gas System Commissioning, and Unit Commissioning.
ROLE: Project Manager (team of 35 Engineers/ Technicians)/ Lead I&C Engineer.
January–September 2021. Egbin Thermal Power Station, Nigeria. Complete overhaul of a GE-Hitachi Frame 5 Gas
Turbine and its auxiliaries. ROLE: Project Manager/I&C Lead Engineer.
June 2020. FIPL Omoku Power Plant, Nigeria. Root Cause Analysis (RCA) of High Exhaust Temperatures on a GE
Frame 5 Gas Turbine. Role: I&C Engineer.
December 2019. FIPL Omoku Power Plant, Nigeria. Hot Gas Path Inspection, including Instrumentation Overhaul,
Fire and Gas Commissioning on a Frame 5P Gas Turbine. Role: Project Manager/I&C Engineer.
September–October 2019. Ibom Power Plant, Nigeria. Repair of the damaged generator accessory compartment on a
GE MS6001 turbine and the re and gas system commissioning on a GE MS9001 turbine. Role: I&C Engineer.
June-August 2019. FIPL Omoku Power Plant, Nigeria. Repair of a re-damaged MS5001P GE Frame 5 unit. Role:
I&C Engineer/Asst. Project Manager.
Skills and knowledge used in roles:
Troubleshooting and Calibration of Instrumentation (Pressure Switches, Thermocouples, Damper Switches,
Temperature Switches, Gas Detectors, RTDs, solenoid valves, and Vibration Sensors).
Industrial Wiring, including troubleshooting and repair of faulty instrument loops.
GE Speedtronics Mk II, Mk V, and Mk VI Control Systems, LSIS Master P5000.
Ladder Logic
MS Project for designing Gantt charts and work schedules and for monitoring project progress.
Team and project management skills to coordinate resources and team members to achieve project goals on time.
Customer Experience Rep
Indigo Books and Music
Sep 2023 - Present
RESPONSIBILITIES
Unpacked merchandise received in skids. Marked down items on sale.
Created new and seasonal displays according to planogram.
Helped customers nd books and items in the store. Took time to show them to the section as this increased sales.
Trained on the cash register, helped customers pay for orders. Processed returns and refunds.
Programming Teacher, Volunteer
Code Club UK
Mar 2017 Nov 2018
Taught ~20 Year 3-6 pupils to code by guiding them through Coding projects.
Took a class from zero knowledge to coding their own portfolio website over the course of a school term.
Tools/Languages taught: HTML/CSS, Scratch, Python and BBC microbit.
IT Helpdesk Ocer
Total Nigeria Plc.
Mar 2015 Jul 2015
Helped develop a new IT policy to simplify issue reporting to the helpdesk, designed an infographic to help raise
awareness for this new policy.
Worked on the IT team to resolve user issues on Outlook, network issues, congure routers & printer servers.
ADDITIONAL EXPERIENCE AND AWARDS
Intermediate level French speaker (B1). Currently improving language skills.
Experience with programming Machine learning/ AI systems with Python, Tensorow, and Keras.
Electronics design experience: Designed temperature acquisition circuit from component chips [2018], various robot
designs with Arduino & raspberry pi [2017, 2021], Designed Battery Management system to control a charger for a
battery made of 18650 Lithium ion cells. [2018]
Electrical & mechanical design experience: Designed electrical systems for a formula style racing car including battery,
motors, ECU. Assisted with the wheel, chassis & suspension design. City University Formula student 2018.